Version: 0.6.0
Path Activity
The Path Activity
is an activity that moves along a predefined path.
The entity will move to each location in the set in order.
Once the entity reaches the last location, it will do the idle activity.
How could this be used?
This could be used to have a tour guide that moves along the post-important paths.
Fields
Road Network
RequiredNodes
RequiredListIdle Activity
RequiredThe activity that will be used when the entity is at the final location.